No Name of Project Capacity Location and Client My Job Price of Project Result
1 Coal Power Plant IKPP, Pindo Deli 800 MW Karawang, Sinarmas IKPP Busdev, Project Calculated BOQ IDR 4 Trillion Until now progress
2 GIS 150kV IKPP, Pindo Deli Karawang 150kV Karawang, Sinarmas, IKPP Busdev, Project Calculated BOQ Until now progress
3 Solar PV Roof Top 1 MWp C&I, PT IMIP Morowali Calculated BOQ, Project IDR 8 Billion Done, COD, ontime
4 Solar PV Floating + TL + GI + SCADA 50 MWp Batam, Tembesi Busdev, Calculated BOQ IDR 420 Billion Done, COD, ontime
5 Hydro Power Plant + TL + GI 510 MW Sumatera Batang Toru, PT North Sumatera Hydro Energy Calculated BOQ, Monitoring EPC, Check QA USD 11.3 Billion Until now progress
6 Mini Hydro Power Plant + TL 4.8 MW Garut, IPP PT Shiraco Busdev, EPCF, Project IDR 148 Billion Until now progress
7 Solar PV Rooftop 1 MWp Otorita IKN Busdev, Calculated BOQ IDR 5 Billion Done, COD, ontime
8 Solar PV + BESS + TL + SCADA 300 MWp + 100 MWh China, Shanzi Yulin Yongchen Check QA and Cost Control RMB 900 Million Done, CoD
9 Wind Power Plant 200 MW China, Guizhou Zunyi Tiangxi Check QA, Comm, Cost Control RMB 1.6 Billion Done, COD
No Name of Project Capacity Location and Client My Job Price of Project Result
1 Coal Power Plant IKPP, Pindo Deli 800 MW Karawang, Sinarmas IKPP Busdev, Project Calculated BOQ IDR 4 Trillion Until now progress
2 GIS 150kV IKPP, Pindo Deli Karawang 150kV Karawang, Sinarmas, IKPP Busdev, Project Calculated BOQ Until now progress
3 Solar PV Roof Top 1 MWp C&I, PT IMIP Morowali Calculated BOQ, Project IDR 8 Billion Done, COD, ontime
4 Solar PV Floating + TL + GI + SCADA 50 MWp Batam, Tembesi Busdev, Calculated BOQ IDR 420 Billion Done, COD, ontime
5 Hydro Power Plant + TL + GI 510 MW Sumatera Batang Toru, PT North Sumatera Hydro Energy Calculated BOQ, Monitoring EPC, Check QA USD 11.3 Billion Until now progress
6 Mini Hydro Power Plant + TL 4.8 MW Garut, IPP PT Shiraco Busdev, EPCF, Project IDR 148 Billion Until now progress
7 Solar PV Rooftop 1 MWp Otorita IKN Busdev, Calculated BOQ IDR 5 Billion Done, COD, ontime
8 Solar PV + BESS + TL + SCADA 300 MWp + 100 MWh China, Shanzi Yulin Yongchen Check QA and Cost Control RMB 900 Million Done, CoD
9 Wind Power Plant 200 MW China, Guizhou Zunyi Tiangxi Check QA, Comm, Cost Control RMB 1.6 Billion Done, COD
PT. POWER ELCOM INDONESIA
POWER ELCOM Group Limited is a wholly private company established in November 2025 with the approval of the State Council.
Hubungi Admin

For information regarding our services, please contact the following:

Alamat

Alamat Legalitas : Jl. Cipinang Raya, Jatinegara Gedung Valdec Lantai 2

Alamat Office : Jl. Boulevard Kelapa Gading, Gedung Kirana Three Bella Tera! Lantai 10

Alamat Operaional : Jl. Tb Simatupang! Cibis Eight Lantai 5, Jaksel

© 2026 – PT. POWER ELCOM INDONESIA. All Rights Reserved. Published by www.ebyb.co.id